Can A PSSR Examination Be Postponed?
Yes, but only once for each examination, and only before the date on the report has passed. Regulation 9(7) of the Pressure Systems Safety Regulations 2000 (PSSR) lets the date after which a system may not be operated without a further examination be moved to a later date, provided four conditions are all met: the competent person and the user or owner agree it in writing, the postponement does not give rise to danger, it is the only postponement for that examination, and the enforcing authority is told in writing before the date. Once the date has gone by, there is nothing left to postpone, and the system must not be operated until it has been examined.
If your examination date is close or has already passed, email the vessel list, the date on the last report and the site address to info@gsbinspections.co.uk. We aim to come back with a quote within 48 hours and will tell you the earliest date we can offer.
Which Date On A PSSR Report Can Be Postponed
A report of examination under Regulation 9(5) carries two kinds of date. One is the date, within the limits the written scheme sets, after which the system may not be operated without a further examination. That next-examination date is the one Regulation 9(7) allows to be postponed.
The other is the date by which any repair, modification or change to the safe operating limits named in the report must be completed. Regulation 9(7) does not cover it. Under Regulation 9(6) the system must not be operated after that date unless the work has been done, so a repair deadline is met by doing the repair, not by agreeing a new date.
The Four Conditions For A Regulation 9(7) Postponement
All four have to be in place. Missing any one of them means the original date stands.
- Written agreement. The competent person and the user of an installed system, or the owner of a mobile one, agree the later date in writing.
- No danger. The postponement must not give rise to danger. The competent person’s view of the system’s condition and history is what that judgement rests on.
- Once only. Only one postponement is allowed for any one examination.
- Notice before the date. The user or owner notifies the enforcing authority for the premises in writing, before the date in the report.
Who Agrees A PSSR Examination Postponement
The agreement is between the competent person and the dutyholder: the user, meaning the employer or self-employed person in control of an installed system, or the owner of a mobile system, one that can readily be moved and used in different places. HSE lists agreeing postponements, where appropriate, among the competent person’s tasks.
Regulation 2 defines the competent person as a competent individual other than an employee, or a competent body of persons. Where the user or owner is itself the competent person, as with an in-house inspection body, Regulation 9(8) replaces the written agreement with a declaration in the notice to the enforcing authority that the postponement will not give rise to danger.
Telling The Enforcing Authority About A PSSR Postponement
The notice goes from the user or owner, in writing, to the enforcing authority for the premises, and it has to arrive before the date in the report. Depending on the main activity at the site, that authority is HSE or the local council: factories, construction and farms generally sit with HSE, while shops, offices, warehousing, hotels and catering generally sit with the council. If you are unsure which applies, settle it before the notice is sent, because a notice to the wrong body, or one sent after the date, does not meet Regulation 9(7).
When The PSSR Examination Date Has Already Passed
Regulation 9(6) is direct about it: the system must not be operated after the next-examination date, or the postponed date if one was properly agreed, unless a further examination under the written scheme has been carried out. Nobody may supply a mobile system for operation after that date either.
In practice that means keeping the system out of use, arranging the examination, and having the written scheme and the last report ready for the engineer. For a mobile system, Regulation 9(9) also requires the owner to mark the next-examination date on the system, legibly and durably, where it can be clearly seen.
Records To Keep After A PSSR Postponement
Regulation 14(1)(d) requires the user or owner to keep any agreement made under Regulation 9(7), and where Regulation 9(8) applies, a copy of the notice sent to the enforcing authority. They are kept until a further examination has been carried out under the scheme. For an installed system, records are kept at the premises where it is installed, unless the enforcing authority has approved other premises, and they pass to a new user in writing if the system changes hands.
Changing PSSR Examiner Instead Of Postponing
Many postponements are requested because the current examiner cannot attend in time rather than because the plant needs longer. In that case another competent person can carry out the examination. Nothing in Regulations 8 or 9 requires the person examining the system to be the one who drew up or certified its written scheme, so the inspection body can change while the existing scheme stays in use, provided it still describes the plant.
Each examination report also has to say whether the competent person considers the scheme suitable or in need of modification, and Regulation 8 requires the scheme to be reviewed at appropriate intervals. Our PSSR inspections page explains how we examine against existing schemes and draw up or review them.
PSSR Postponement Questions
Can a PSSR examination be postponed more than once?
No. Regulation 9(7) allows only one postponement for any one examination.
Can the postponement be agreed over the phone?
No. The competent person and the user or owner must agree it in writing, and the enforcing authority must be told in writing before the date. The only exception to the written agreement is the in-house case under Regulation 9(8).
Does the enforcing authority have to approve the postponement?
Regulation 9(7) requires written notification before the date. It does not set out an approval step, but the other three conditions still have to be met.
Can the repair deadline in a report be postponed?
Not under Regulation 9(7), which applies to the next-examination date. Under Regulation 9(6) the system must not be operated after the repair date unless the work has been done.
Who deals with a postponement for a hired mobile compressor?
The owner, which for a hired mobile system is usually the hire company. The owner also has to mark the next-examination date on a mobile system.
What if the examiner thinks a delay would be unsafe?
Then there is no postponement. Regulation 9(7) only allows one where it does not give rise to danger.
Book A PSSR Examination Before Your Date Runs Out
GSB has five engineers acting as competent persons, so a pressure system examination is not tied to one surveyor’s diary. We examine against existing written schemes, write schemes for plant that has none, and take on a single receiver as readily as multi-site contracts with renewal dates aligned. We examine and report only, with no repairs, servicing or equipment sales.
Email the vessel list, the date on the last report and the site address to info@gsbinspections.co.uk, or call 01782 855481 to talk it through with one of the directors, both senior engineers, then send the details in writing so the job is on record from enquiry to report.